Construction of a complex on a land with an area of 9732 square meters and the surface area of the building is equal to 22540/38 square meters in 5 blocks and 5 floors with a total of 186 residential units, concrete frame type with block beam roof and travertine facade, creating an absorption well and installation Elevator in every block and…
This complex was built in phase 5 of Andisheh to accommodate the employees of Andisheh city.
Excavation and excavation of 20,000 cubic meters, the amount of concrete is equal to 8,000 cubic meters and the total amount of rebar used is equal to 1,850 tons, the block beam used is 80,000 meters long.